News of the Lesswatt Project

Newsletter #1 available on-line

Newsletter n.1 is now available on-line and can be downloaded from the section Download/Newsletter.

Share
Second student visit

The 24th of May 2018 took place at WRRF CUOIODEPUR, the second didactic visit with the students of the course of Environmental Engineering and Sanitation of University of Florence. During the visit,

Share
First student visit

The 08th of May 2018 took place at WRRF CUOIODEPUR, the first didactic visit with the students of the Italian Genuine Vegetable-Tanned Leather Consortium (Consorzio Vera Pelle Italiana Conciata al

Share
Launch conference and first lesswatt workshop

The Launch Conference of the Lesswatt Project will take place in March 13 2018

Share
LIFE16 Kick-off Meeting, Bruxelles

The 16th and 17th October 2017 the New LIFE projects kick off has been held in Brussels.

Share
Environment, wastewater: launch of the European project Lessdrone at UNIFI

A team of researchers coordinated by the Department of Civil and Environmental Engineering at the University of Florence will develop Lessdrone.

Share
Innovation wireless tool for reducing energy consumption and GHGs emission of water resource recovery facilities.

Development of an innovative tool for minimizing the overall greenhouse gases (GHGs) emission due to aerobic biological wastewater treatment.

Share
Project activities
Tracks the operational work of the project.
Action A2 completed

Action A2 (Survey on Italian, Belgian and Dutch WRRFs) has been completed. In this action, the WRRFs characteristics that could influence the prototype design and development were assessed. This evaluation

Share
Genova Sestri Ponente WRRF – Monitoring campaign completed

The monitoring campaign for the in-depth characterization of the plants.

Share
Action A1 completed

The action A1 (Test WRRF characterization) has been completed. In this action, the efficiency of the oxidation tanks of CUOIODEPUR has been evaluated and the biomass has been characterized. The space-time variability of air

Share
Cuoiodepur WRRF – Third monitoring campaign completed

The third monitoring campaign for the in-depth characterization of test plant in terms of biological tanks inlet and outlet quality, oxygen and air spacial distribution and biomass cinetic parameter assessment

Share
Lessdrone design completed

The design of the LESSDRONE has completed. The second part of the B1 action will be used for the construction and refinement of LESSDRONE prototype.

Share
S. Colombano and Roma est WRRFs – Monitoring campaigns completed

The monitoring campaign for the in-depth characterization of the plants.

Share
Cuoiodepur WRRF – Second monitoring campaign completed

The second monitoring campaign for the in-depth characterization of test plant in terms of biological tanks inlet and outlet quality, oxygen and air spacial distribution and biomass cinetic parameter assessment

Share
Eindhoven and Tilburg WRRFs – Monitoring campaigns completed

The monitoring campaign for the in-depth characterization of the plants.

Share
Questionnaire on Italian and Be.Ne.Lux. WRRFS sent

A questionnaire survey has been sent to Italian and Be.ne.lux water utilities

Share
Cuoiodepur WRRF – First monitoring campaign completed

The first monitoring campaign for the in-depth characterization of test plant.

Share