In January 2021, the first measurement campaign planned at Roma est WRRF was completed. The campaign, which was intended to measure oxygen transfer and the production of greenhouse gases produced by oxidation tanks, was carried out using the LESSDRONE prototype.

Newsletter n.5 is now available on-line and can be downloaded from the section Download/Newsletter.

In September and October 2020, the measurement campaigns planned at Tillburg and Eindhoven WRRFs (The Netherlands) were completed.

Download the slides of the second workshop of the Lesswatt project held at the ECOMONDO 2020 Fair.

The LESSWATT project takes part in ECOMONDO 2020. Thursday 5 November at 2 pm. Follow us, it's free!

In September and October 2020, the measurement campaigns planned at Tillburg and Eindhoven WRRFs (The Netherlands) were completed.