B3 – Third measurement campaign at Cuoiodepur WRRF completed

In October 2019, the third of the 6 measurement campaigns planned at the Cuoiodepur WRRF was completed. The campaign, which was intended to measure oxygen transfer and the production of

Share
B3 – Second measurement campaign at Cuoiodepur WRRF completed

In June 2019, the second of the 6 measurement campaigns planned at the Cuoiodepur WRRF was completed. The campaign, which was intended to measure oxygen transfer and the production of

Share
B3 – First measurement campaign at Cuoiodepur WRRF completed

In May 2019, the first of the 6 measurement campaigns planned at the Cuoiodepur WRRF was completed. The campaign, which was intended to measure oxygen transfer and the production of

Share
Action B2 completed

The drone has been tested under different operating conditions. The first tests were carried out in the laboratory to verify the functionality of the instrumentation and sensors, while at the

Share
Action B1 completed

The design and assembly of the equipment making up the LESSDRONE were completed. The automatic positioning of the hull and the analysis instrumentation are connected through a specific software that

Share
Action A2 completed

Action A2 (Survey on Italian, Belgian and Dutch WRRFs) has been completed. In this action, the WRRFs characteristics that could influence the prototype design and development were assessed. This evaluation

Share
A2 – Genova Sestri Ponente WRRF – Monitoring campaign completed

The monitoring campaign for the in-depth characterization of the plants.

Share
Action A1 completed

The action A1 (Test WRRF characterization) has been completed. In this action, the efficiency of the oxidation tanks of CUOIODEPUR has been evaluated and the biomass has been characterized. The space-time variability of air

Share
A1 – Cuoiodepur WRRF – Third monitoring campaign completed

The third monitoring campaign for the in-depth characterization of test plant in terms of biological tanks inlet and outlet quality, oxygen and air spacial distribution and biomass cinetic parameter assessment

Share
B1 – Lessdrone design completed

The design of the LESSDRONE has completed. The second part of the B1 action will be used for the construction and refinement of LESSDRONE prototype.

Share