In January 2020, the fifth of the 6 measurement campaigns planned at the Cuoiodepur WRRF was completed. The campaign, which was intended to measure oxygen transfer and the production of greenhouse gases produced by oxidation tanks, was carried out using the LESSDRONE prototype.
B3 – Fifth measurement campaign at Cuoiodepur WRRF completed

Download the slides of the second workshop of the Lesswatt project held at the ECOMONDO 2020 Fair.

The LESSWATT project takes part in ECOMONDO 2020. Thursday 5 November at 2 pm. Follow us, it's free!

In September and October 2020, the measurement campaigns planned at Tillburg and Eindhoven WRRFs (The Netherlands) were completed.

In September 2020 the LESSWATT project was published on the website of the MATTM (Italian Ministry of the Environment and Protection of the Territory and the Sea).